The Bauchi State Police Command has arrested two suspects and recovered a stolen 2022 Toyota Hilux allegedly trafficked from Jos, Plateau State, in what the Command described as another breakthrough in its campaign against property-related crimes.
According to a statement issued on Saturday by the Police Public Relations Officer, SP Nafiu Habib, the vehicle was stolen on July 17, 2026, from the premises of Oasis Bakery in Bukuru, Jos, where it had been parked by its owner, a 48-year-old resident of Kwata Zawan.
Police said the theft was allegedly carried out “deceitfully with the aid of alleged military personnel.”
Acting on intelligence received from Jos, detectives attached to the State Criminal Investigation Department (SCID) launched an operation that led to the arrest of the suspects at Larema Hotel, GRA Dass Road, Bauchi, on Saturday.
The suspects were identified as Ibrahim Tijjani, 31, of Federal Low Cost, Jos, described by police as a dismissed Lieutenant of the Nigerian Army who was disengaged in 2021, and Umar Muhammad, 33, of Unguwar Rogo, Jos.
During interrogation, police said the prime suspect, Ibrahim Tijjani, confessed to stealing the Hilux and admitted to having previously stolen two other vehicles from Bauchi before disposing of them in another state.
The Commissioner of Police, CP Sani-Omolori Aliyu, praised the professionalism of the SCID detectives for the successful operation.
“This recovery adds to the about six motor vehicles already recovered by the Command in the first two weeks of July 2026 in the ongoing fight against property crime,” the commissioner said.
He also appealed to residents to remain vigilant and cooperate with security agencies.
“See something, say something, so the Police can do something,” the commissioner urged.
The recovered Toyota Hilux has been returned to its owner, while police said investigations are continuing.
The suspects are expected to be charged in court upon the conclusion of the investigation.
Electricity allocation to distribution companies serving Nigeria’s estimated 220 million people has dropped to 948 megawatts.
Checks on Friday by Peoples Gazette at about 3:15 p.m. on the Nigeria Grid website showed that the 11 electricity distribution companies received a combined allocation of 948MW.
According to the data, Ikeja Disco received the highest allocation of 133MW, followed by Eko Disco with 132MW and Ibadan Disco with 119MW.
Benin Disco received 115MW, while Enugu Disco got 110MW. Abuja Disco received 109MW, followed by Port Harcourt Disco with 104MW.
Yola Disco received 37MW, while Kano Disco got 31MW. Jos Disco and Kaduna Disco received 30MW and 28MW, respectively.
The development comes amid a worsening electricity crisis in Nigeria, with power generation on the national grid continuing to decline.
Nigeria’s national grid collapsed twice in four days in January. Generation crashed from 3,825 megawatts to 39 megawatts in minutes.
The Gazette reported that the Nigerian Independent System Operator (NISO) showed that power generation dropped to 0 megawatts (MW).
The 2027 senatorial candidate of the Allied People’s Movement, APM, in Bauchi Central, Abdulrazak Nuhu Zaki, has accused Senator Abdul Ahmed Ningi of working against his attempt to compel the contractor handling the abandoned Ningi Water Project to return to site.
Zaki said his efforts to get the project completed were frustrated despite support from lawmakers when he raised the matter at the National Assembly.
The former member of the House of Representatives disclosed this on Friday during an interview organised by the Bauchi Correspondents’ Chapel of the Nigeria Union of Journalists as part of its 2027 Election Interview Series.
He said the water scheme was already in existence before he entered the House of Representatives but stalled after the contract was awarded and money released, with only a well drilled before work stopped.
Zaki alleged that a company belonging to a former vice-president was awarded the contract, but failed to deliver the project, which was expected to address water shortages in Ningi town.
He said he decided to take the matter to the House through a motion, seeking to compel the contractor to resume work and fulfil its contractual obligations.
However, Zaki alleged that Senator Ningi, who was then serving in the Senate, took steps to discourage the intervention.
He said, "When I brought the matter before the National Assembly, I wanted the contractor to be brought back to the site to complete the project because the people of Ningi were in serious need of water."
The senatorial candidate claimed that Ningi subsequently approached the then Speaker of the House to challenge his involvement, arguing that questioning the project was tantamount to confronting the former Vice-President associated with its execution.
Zaki said he was more concerned about the public interest and the need to prevent public funds from being wasted on an uncompleted project.
Moving beyond the water project, the former lawmaker listed electricity and road infrastructure among the areas where he made contributions during his time in the House.
He claimed to have facilitated the installation of over 20 transformers in Ningi and Warji local government areas, including provisions for the two local government secretariats.
He also identified the Warji-Dogon and Warji-Gwaram feeder roads as some of the projects he facilitated, noting that the state government subsequently upgraded the routes to tarred roads.
On his 2027 Senate ambition, Zaki said he was relying on his previous legislative experience and the encouragement of constituents to seek a seat in the upper chamber.
He argued that experienced lawmakers were better positioned to navigate legislative procedures and influence budgetary allocations, alleging that first-time legislators were often disadvantaged by established networks within the National Assembly.
He said his experience in the Seventh Assembly had equipped him with the knowledge needed to represent Bauchi Central effectively.
The allegations against Senator Ningi, including claims surrounding the abandoned water project and the circumstances surrounding its execution, could not be independently verified.
Efforts to obtain Ningi's reaction were unsuccessful as of the time of filing this report.